Flooring brought into house to acclimate

As I mentioned in an earlier post we are using bellawood 3 1/4 ” select maple flooring for this project. This prefinished flooring was purchased with a 100 year transferable warranry. http://www.lumberliquidators.com/catalog/product.jsp?productId=1519

We will be installing the flooring in this house in sections. The flooring for the first section has been brought into the house to acclimate to the conditions of the room. After three to five days the moisture content of the new flooring will be the same as the room in which it will be installed and as a result will be as stable as possible going forward.

flooring stored in room for acclimation

storing flooring for acclimation

This entry was posted in Basement Stairs, Flooring 3 1/4" Maple, Kitchen Remodel w/new basement stairs and floors and tagged , , , . Bookmark the permalink.

Comments are closed.